Move In
Revision as of 21:02, 4 November 2018 by Anonymous Moose (talk | contribs)
Moving equipment from our storage facility and preparing camp for Week 1 is the responsibility of the logistics director, who will coordinate his job closely with the camp director. The detailed role and responsibilities of the logistics director can be found here.