Difference between revisions of "Move Out"
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
Moving equipment back to [[The Storage|our storage facility]] and closing down Camp Shehaqua after the last week of camp is the responsibility of the logistics director, who will coordinate his job closely with the camp director. The detailed role and responsibilities of the logistics director [[Logistics Director|can be found here]]. | Moving equipment back to [[The Storage|our storage facility]] and closing down Camp Shehaqua after the last week of camp is the responsibility of the logistics director, who will coordinate his job closely with the camp director. The detailed role and responsibilities of the logistics director [[Logistics Director|can be found here]]. | ||
− | [[File:Move-Out Checklists 2018.pdf|thumb|Move-out Checklists for Camp Shehaqua]] | + | As a resource for the logistics director we have created a file with detailed checklists for all parts of Camp Shehaqua that need cleaning at the end of our programs. We recommend that you print copies of this file before camp. [[File:Move-Out Checklists 2018.pdf|thumb|Move-out Checklists for Camp Shehaqua]] |
Latest revision as of 20:30, 1 December 2018
Moving equipment back to our storage facility and closing down Camp Shehaqua after the last week of camp is the responsibility of the logistics director, who will coordinate his job closely with the camp director. The detailed role and responsibilities of the logistics director can be found here.
As a resource for the logistics director we have created a file with detailed checklists for all parts of Camp Shehaqua that need cleaning at the end of our programs. We recommend that you print copies of this file before camp. File:Move-Out Checklists 2018.pdf